People crossing a street in Mountain View, California
Pedestrians cross the intersection of California Street and Castro Street in Mountain View on Nov. 9, 2026. Photo by Allyson Moore.
Lấy Âm thanh Trinity Người chơi đã sẵn sàng...

Mountain View is developing plans to remove the traffic lights at a major downtown intersection in favor of a roundabout that includes upgraded bike lanes and crosswalks.

On Nov. 9, the Council Transportation Committee unanimously backed a proposal to redesign the intersection at Castro and California streets, which is part of a larger project to make permanent the closure of three blocks of Castro Street to cars. Earlier this year, the City Council approved concept designs thêm 21-foot-wide central crosswalks to the intersection at Villa and Dana streets.

California Street is at the southern tip of the closed off portion of Castro Street. Currently, the intersection has a traffic circle and traffic signals for vehicles and pedestrians, as well as crosswalks. Bollards and railings at the north end of the intersection block vehicles from entering Castro Street. There is also an existing sewer manhole in the middle of the traffic circle.

The proposed design for the intersection at Castro and California streets. Image courtesy of Mountain View.

The proposed changes include a new roundabout without traffic signals, according to Joseph Cervantes, the city’s senior civil engineer. The concept design also includes protected bike lanes, providing the option for bicyclists to either use the circular roadway to get through the intersection or the bike lanes and crosswalks to get around it, Cervantes said.

Other upgrades include high visibility crosswalks, raised landscape medians, enhanced lighting and “fortified” bollards at the Castro Street entrance, according to the staff report.

Councilmember Alison Hicks described the layout as “efficient and clean,” agreeing with Councilmember John McAlister that removing the existing signalized traffic circle would “reduce visual clutter” at the intersection.

“Clutter I think can make us less safe with an information overload,” Hicks said.

Construction is estimated to cost roughly $1.7 million, according to a staff memo.

Cars driving through an intersection in Mountain View, California
The intersection is set to receive upgrades including high visibility crosswalks and enhanced lighting. Photo by Allyson Moore.

Councilmembers generally favored the proposed concept design, although they had some questions about how the roundabout would improve road safety.

Councilmember Ellen Kamei expressed concern about bicyclists sharing the road with drivers going through the intersection, noting that it was important to let the community know about the changes.

On Oct. 28, the Bicycle and Pedestrian Advisory Committee weighed in on the project and recommended adding raised crosswalks to slow down vehicles before entering the roundabout.

“Since the intersection accommodates several bus routes, staff do not recommend raising crosswalks, which will deteriorate ride quality,” Cervantes said at the Nov. 9 transportation meeting.

Mountain View resident Silja Paymer, a frontrunner in the Cuộc bầu cử Hội đồng Thành phố Mountain View, pushed back on that justification, describing pedestrian and bicycle safety as a higher priority.

“I think safety is kind of more important than comfort,” she said.

McAlister voiced some concerns about the potential removal of parking spots to make way for the new street layout.

Cervantes noted that two parking spots in front of 756 California St. may be removed, but said the city was still looking into it. A parking spot in front of 800 California St. could also be taken out to accommodate a loading zone and drop off area.

“The intent of the design is to minimize the loss of parking,” he said.

Cervantes added that the city is also looking into adding “vertical delineators” to prevent vehicles from blocking bicycle lanes. He described that as a problem on El Camino Real, which got bike lanes last year.

The design for the Castro and California street intersection is expected to be completed at the end of next year, according to Cervantes. The design plan for the Villa and Dana street intersection improvements along Castro Street is anticipated to be finished next summer, with construction to start at the end of 2027, he said.

Câu chuyện này lần đầu tiên được đăng trên tờ Mountain View Voice . Emily Margaretten gia nhập Mountain View Voice vào năm 2023 với tư cách là phóng viên đưa tin về Tòa thị chính.

Chính sách bình luận (cập nhật ngày 5/10/2023): Người đọc được yêu cầu đăng nhập thông qua mạng xã hội hoặc nền tảng email để xác nhận tính xác thực. Chúng tôi có quyền xóa nhận xét hoặc cấm những người dùng tham gia vào các cuộc tấn công cá nhân, ngôn từ kích động thù địch, tục tĩu quá mức hoặc đưa ra những tuyên bố sai có thể kiểm chứng được. Nhận xét được kiểm duyệt và phê duyệt bởi quản trị viên.

Bình luận

Liên kết bí mật